Substation "Hurzuf" "Yarema"
Works on technical re-equipment of 110/10 kV substation "Hurzuf" "Yarema".
The main installed equipment at the facility:
Transformer TFZM-110 B-IV 300/5.
Electric gas switch LTB145 D1 / B3 110 kV.
Transformer protection panel / DIAMOND / TO11TO30.
Battery type SP-12-100.