Substation "Hurzuf" "Yarema"

  • Works on technical re-equipment of 110/10 kV substation "Hurzuf" "Yarema".

The main installed equipment at the facility:
  • Transformer TFZM-110 B-IV 300/5.
  • Electric gas switch LTB145 D1 / B3 110 kV.
  • Transformer protection panel / DIAMOND / TO11TO30.
  • Battery type SP-12-100.