Проекты

Substation "University" - RP-201, Substation "Teremkivska" - RP-67

Reconstruction of existing 10 kV cable lines:
       from RU-10kV PS University to RU-10kV RP201 (2.4km) with APvEgaPu-8 brand cable, 7/15-3 (1x500(g)/50) with a total length of 14500 m;
•       from RU-10kV Teremkivska substation to RU-10kV RP67 (3km) by APvEgaPu-8.7/15-3 cable (1x500 g)/95) with a total length of 18,100 m.
Projects