Проекты

Connection to the power grid of the residential and office complex

The project envisages:
1. TP 10/0.4 kV   power supply with four 10 kV CL:
  • from RU-10 kV TP1966 and from RU-10 kV TP2056 with a total length of 1150 m.
  • from RU-10 kV TP876 and from RU-10 kV TP4334 with a total length of 1400 m.
2. Laying of KL10kV from RP210 to TP4334 with APvEgaPu-15 3 (1x120(g)/50) brand cable with a length of 200m.
3. Laying of KL10kV from TP2009 to TP2056 with APvEgaPu-15 3 (1x120(g)/50) brand cable with a length of 195m.
4. Installation of two 1000 kVA power transformers in the 10/0.4 kV substation.
5. Installation of equipment in RU-10 kV and in RU- 0.4 kV.
2021-02-06 14:10 Projects