The project provides for the implementation of the following works:
Phase A:
replacement of the crushed stone ballast of the oil receiver; restoration of the oil receiver bowl; replacement of the fire extinguishing system, racks; dismantling of the reactor, moving to the storage site; arrangement of a temporary storage area for dismantled reactors; installation of the reactor, busbars; performance of commissioning works.
Phase B:
replacement of the crushed stone ballast of the oil receiver; restoration of the oil receiver bowl; dismantling of the reactor, moving to a temporary storage site; dismantling of the rail tracks; replacement of NSP-type plates dismantling with subsequent installation of a 110 kV busbar support - 3 pcs; replacement of a cable up to 35 kV in the channel - 283 m; replacement of the fire extinguishing system, racks; dismantling with subsequent installation of a support under the dry pipe; replacement of a transition through the dry pipe; installation of the reactor, busbars; commissioning work.
Phase C:
replacement of crushed stone ballast of the oil receiver; restoration of the dry pipe surface; oil filling with degassing; cooler replacement; installation of a 750 kV surge arrester; laying a cable for the fire extinguishing system; commissioning work; installation of a fire shield;