Construction of 10-0.4 kV networks for power supply of residential complex "Sadochok"
According to the project, the following works were performed:
installation of 2 TMG-1000/10/0.4 kV power transformers;
installation of a complete 0.4 kV switchgear equipped with 9 cells in the existing transformer substation10/0.4 kV;
arrangement of accounting of technical needs of the transformer substation and on inputs of 0.4 kV in switchgear 0.4 kV;
construction of cable line 0.4 kV from switchgear 0.4 kV transformer substation10/0.4 kV to distribution substation 0.4 kV residential buildings №1, №2, №3.