- laying of a double-chain 10 kV cable line from Livoberezhna substation to distribution substation №216 with a length of 2,250 m;
- laying of a fiber-optic communication cable (FOCL) between Substation "Livoberezhna" and distribution substation №216;
- completion of terminal equipment in the Livoberezhna Substation, in cable wells and distribution substation №216 for connecting the FOCL cable.