The scope of reconstruction includes:
  • complete dismantling of existing equipment in10 kV Indoor Distribution Switchgear (disconnectors, separators, arresters, short-circuiters, 110 kV linear inputs (110 kV Indoor Distribution Switchgear) and 110 kV busbars);
  • installation of compact hybrid compact switchgear power transformers of the HYpact-145 type;
  • installation of 110 kV linear surge arresters of the PCA3108 type;
  • installation of linear capacitor inputs 110 kV GSA123-АА/2000 (110 kV Indoor Distribution Switchgear);
  • installation of surge arresters 10 kV;
  • installation of the 110 kV project equipment busbar;
  • modernization of relay protection and automation;
  • installation of heating and ventilation systems.

The project also envisages the construction of a fiber-optic communication line on the territory of the Troyeshchyna power plant and the Eastern RCM with its inclusion in the existing technological communication network of DTEK Kyiv Electric Networks.