- dismantling of existing reactors. Construction of foundations and installation of new shunt reactors;
- connection of the new reactor to the existing 750 kV busbar scheme;
- construction of new foundations for the 750kV substation;
- replacement of 750kV OPN;
- installation of an automatic fire extinguishing controller based on the REQ650 company "ABB";
- reconstruction of the existing reactor oil receiver;
- replacement of reactor power and control cables;
- construction of new fire protection walls. Reconstruction of the existing dry pipe lining of the reactor fire extinguishing system, with connection to the existing network;
- partial reconstruction of the existing fire extinguishing automation of RSh-ZAES.