Проекты

Connection to the electrical network of the residential and office complex

Construction of cable-pipe sewerage (total number of chambers 11 pcs.) and laying of 10 kV cable lines (from RP to TP#1, TP#2, TP#3, TP#4) and 0.4 kV from TP#2 and TP No. 4 to the VRP of residential buildings No. 2 and No. 4, boiler rooms 2 and 4 of buildings   for power supply 1, 2 and 4 of the construction stage of construction.
Projects