Connection to the electrical network of the residential and office complex
Construction of cable and pipe sewerage (total number of chambers 11 pcs.) and laying of 10 kV cable lines (from the distribution switchgear to Transformer Substations №1, №2, №3, №4) and 0.4 kV from Transformer Substation №2 and Transformer Substation №4 to the distribution switchgear of residential buildings №2 and №4, boiler rooms 2 and 4 of the building for power supply of the 1st, 2nd and 4th construction phases.