2) Foundation construction and installation of two 40 MW transformers. 3) Construction of a general substation control point. 4) Construction of a complete 10 kV switchgear (KRPZ-10 kV) 5) Installation of 12 cable lines with a voltage of 10 kV from RP-10kV to KRPZ-10kV of PS "Fursy" with 3 single-core cables per circuit. 6) Installation of relay protection devices and automation of 110kV elements. 7) Installation of fire safety systems and external lighting of the territory.
Reconstruction of VRU-110 kV PS-110/35/10 kV "Ros" in terms of installation of two additional cells.
The complete set of VRU-110 kV is provided with the following equipment:
110 kV circuit breaker - electric and gas three-pole with a complete drive;
electric and gas current transformers 110 kV;
disconnectors 110 kV - horizontally rotating three-pole with two grounding blades as LR-110 kV and SHR-110 kV;