Substation 110/35/10 kV "Bilychi"

Reconstruction of the 110 kV open switchgear:
  • arranging the connection of the projected 110 kV cable line to the existing 110 kV open switchgear;
  • installation of three sets of 110 kV voltage transformers and their disconnectors;
  • installation of 110 kV current transformers in an automatic jumper;
  • replacement of 110 kV current transformers and their clamp boxes;
  • replacement of high-voltage equipment in 110 kV neutrals.

Construction of a 110 kV cable line:
  • laying cable line110 kV from the power transmission tower of the 110 kV overhead power line "Pivnichna - Irpin №3" to the 110/35/10 kV substation "Bilychi";
  • arrangement of aerial cable connection (wind-cable connection) on the support;
  • installation of end cable couplings and 110 kV surge arresters at the 110/35/10 kV "Bilychi" substation.

Reconstruction of the network of own needs:
  • protection of 110 kV lines "Irpin", "Pivnichna";
  • protection of 35 kV lines "Brest-Litovska A", "Brest-Litovska B";
  • tap-changer automation of existing power transformers T-1, T-2, T-3;
  • protection and automation TN-110-35 kV;
  • central alarm system.