- construction of Starting Switchgear 110 kV;
 - re-installation of sections of cable line 110 kV from Substation "Nyvky-1 and -2" to buses of Substation "Mototsikletna";
 - dismantling of existing equipment;
 - dismantling of substation building structures;
 - construction of a four-story closed 110/10 kV substation with a cable basement;
 - installation of heating, ventilation and air conditioning systems;
 - installation of water supply and sewage systems, fire protection systems;
 - installation of the main and additional equipment of the 110/10 kV substation.
 
The following are subject to replacement:
- disconnectors with drives - 6 sets;
 - separators - 2 sets;
 - surge arresters 110 kV 6 sets;
 - grounding devices with drives and arresters - 2 sets in power transformer circuits;
 - power transformer T1 TRDCN-63000/110-U1 115+9x1.78%/10.5-10.5kV.