This project provides for the following works:
construction of PU-110 kV;
re-installation of sections of KL-110 kV from PS "Nyvky-1 and -2" to buses of PS "Mototsikletna";
dismantling of existing equipment;
dismantling of substation building structures;
construction of a four-story closed 110/10 kV substation with a cable basement;
installation of heating, ventilation and air conditioning systems;
installation of water supply and sewage systems, fire protection systems;
installation of the main and additional equipment of the 110/10 kV substation.
The following are subject to replacement:
disconnectors with drives - 6 sets;
separators - 2 sets;
surge arresters 110 kV 6 sets;
grounding devices with drives and arresters - 2 sets in power transformer circuits;
power transformer T1 TRDCN-63000/110-U1 115+9x1.78%/10.5-10.5kV.