Проекты

Substation 110/10 kV «Motorcycle»

This project provides for the following works:
  • construction of PU-110 kV;
  • re-installation of sections of KL-110 kV from PS "Nyvky-1 and -2" to buses of PS "Mototsikletna";
  • dismantling of existing equipment;
  • dismantling of substation building structures;
  • construction of a four-story closed 110/10 kV substation with a cable basement;
  • installation of heating, ventilation and air conditioning systems;
  • installation of water supply and sewage systems, fire protection systems;
  • installation of the main and additional equipment of the 110/10 kV substation.

The following are subject to replacement:
  • disconnectors with drives - 6 sets;
  • separators - 2 sets;
  • surge arresters 110 kV 6 sets;
  • grounding devices with drives and arresters - 2 sets in power transformer circuits;
  • power transformer T1 TRDCN-63000/110-U1 115+9x1.78%/10.5-10.5kV.
2021-08-05 01:50 Projects