The project envisages: 1. The power supply of the 10/0.4 kV transformer substation will be provided by four 10 kV cable lines from the existing city networks. 2. Installation of two 1000 kVA power transformers in the 10/0.4 kV transformer substation. 3. Installation of equipment in switchgear 10 kV and in switchgear 0.4 kV.