The project envisages: 1. TP 10/0.4 kV to be supplied by four 10 kV CLs from the existing networks of the city. 2. Installation of two 1000 kVA power transformers in the 10/0.4 kV substation. 3. Installation of equipment in RU-10 kV and in RU- 0.4 kV.