The project envisages:
1. TP 10/0.4 kV  to be supplied by four 10 kV CLs from the existing networks of the city.
2. Installation of two 1000 kVA power transformers in the 10/0.4 kV substation.
3. Installation of equipment in RU-10 kV and in RU- 0.4 kV.