Back to projects

Renovation of seven units and the integration of a 300-MW unit at CHPP-6 into the energy market.

Reconstruction of 7 bays of the first and second busbar systems of the 110-kV switchgear at CHPP-6 of the “KYIV CHPPs” Joint Venture.