This project includes:
· laying a 2,250-meter-long 10 kV double-circuit cable line from the “Livoberezhna” substation to Substation 216;
· laying of a fiber-optic communication cable (FOC) between the Livoberezhna substation and RP-216;
· installation of terminal equipment at the Livoberezhna substation, in cable manholes, and at RP-2160 for connecting the FOC cable.