Back to projects

750 kV substation “Zaporizka”

The project provides for the following works:

Phase A:

  • replacement of crushed stone ballast of the oil receiver;
  • restoration of the oil collection pit;
  • replacement of the fire extinguishing system and supports;
  • dismantling of the reactor and relocation to a storage area;
  • arrangement of a temporary storage area for dismantled reactors;
  • installation of the reactor and busbar connections;
  • commissioning works.

Phase B:

  • replacement of crushed stone ballast of the oil receiver;
  • restoration of the oil collection pit;
  • dismantling of the reactor and relocation to a temporary storage area;
  • dismantling of R-50 rail tracks;
  • replacement of NSP slabs;
  • dismantling and subsequent installation of 110 kV bus support structures – 3 units;
  • replacement of up to 35 kV cable in the channel – 283 m;
  • replacement of the fire extinguishing system and supports;
  • dismantling and subsequent installation of dry pipe support;
  • replacement of the crossing over dry pipe PS-1;
  • installation of the reactor and busbar connections;
  • commissioning works.

Phase C:

  • replacement of crushed stone ballast of the oil receiver;
  • restoration of the dry pipe surface;
  • oil filling with degassing;
  • replacement of the cooler;
  • installation of a 750 kV surge arrester;
  • laying of cable for the fire extinguishing system;
  • commissioning works;
  • installation of a fire shield.

Client: NPC “Ukrenergo”