750 kV Zaporizhzhia Substation

This project involves the following work:

  • Dismantling of existing reactors. Construction of foundations and installation of new shunt reactors;
  • Connection of the new reactor to the existing 750 kV busbar system;
  • Construction of new foundations for the 750 kV switchgear;
  • replacement of 750 kV oil-filled transformers;
  • installation of an ABB REQ650-based automatic fire suppression controller;
  • reconstruction of the existing reactor oil receiver;
  • replacement of reactor power and control cables;
  • construction of new fire protection walls. Reconstruction of the existing dry-pipe piping of the reactor fire suppression system, with connection to the existing network;
  • partial reconstruction of the existing fire suppression automation system at the Zaporizhzhya NPP.

Client: NPC “Ukrenergo”