Back to projects

330 kV “Podilskaya” Substation

1. Design works (working documentation stage) with individual construction solutions for the protection of the autotransformer, including approval with an expert organization.

2. Construction and installation works:

  • dismantling of existing equipment and busbar systems;
  • construction of a protective structure for 2AT made of monolithic reinforced concrete;
  • installation of an oil collection pit designed to receive the full volume of transformer oil;
  • installation of oil drainage channels to divert oil from the oil collection pit into the existing oil sump;
  • installation of new equipment supports at the 330 kV switchyard;
  • installation of cell-type portal structures;
  • construction of a pre-detonation shield made of metal structures around the perimeter and above the 2AT protective structure to prevent direct impact on the protective structure;
  • installation of temporary protection structures for openings;
  • installation of working and emergency lighting systems for the physical protection structure;
  • grounding and lightning protection of the designed equipment;
  • installation of autotransformer type ATDTN-200000/330/110-U1 (PJSC “ZTR”);
  • installation of a 3-phase 220 kV surge arrester set with operation counters;
  • installation of a 3-phase 110 kV surge arrester set;
  • installation of busbar systems for 10–220 kV equipment being installed;
  • installation of 10 kV switchgear (KRUZ);
  • installation of a 0.5 m wide cable tray branch;
  • organization of cable connections between different parts of the electrical power distribution process.