- Design works (working documentation stage) with individual construction solutions for the protection of the autotransformer, including approval with an expert organization.
- Construction and installation works:
- dismantling of existing equipment and busbar systems;
- construction of a protective structure for AT-2 made of monolithic reinforced concrete;
- installation of an oil collection pit designed to receive the full volume of transformer oil;
- installation of oil drainage channels to divert oil from the oil collection pit into the existing oil sump;
- installation of new equipment supports at the 220 kV switchyard;
- installation of cell-type portal structures, between which a mesh system (anti-drone net) is installed above the protective structure to prevent direct impact on the protective facility;
- installation of working and emergency lighting systems for the physical protection structure;
- grounding and lightning protection of the designed equipment;
- installation of autotransformer type ATDTN 125000/220/110/6 U;
- installation of a 3-phase 220 kV surge arrester set type PCA33E192L21E2M8-245-5 with operation counters type SC13 (TycoElectronics RaychemGmbH);
- installation of a 3-phase 6 kV surge arrester set type MWK-8 (ABB);
- reconstruction and adaptation of the 6 kV bus bridge;
- installation of busbar systems for 6–220 kV equipment being installed;
- installation of a 0.5 m wide cable tray branch;
- organization of cable connections between different stages of the electrical power generation process.
Client: NPC “Ukrenergo”