110/35/10 kV “Ros” Substation, 110/10 kV “Fursi” Substation

Construction of a new 110/10 kV substation “Fursy” with a capacity of 2×40 MVA:

1) Construction of a 110 kV outdoor switchgear (OSG-110 kV) equipped with the following equipment:

  • 110 kV circuit breaker – gas-insulated, three-pole;
  • 110 kV current transformers;
  • 110 kV voltage transformers;
  • 110 kV disconnectors – horizontal-rotary, three-pole;
  • 110 kV surge arresters for ZRN-110;
  • neutral grounding device ZRN-110, single-pole.

2) Construction of foundations and installation of two transformers with a capacity of 40 MVA.

3) Construction of a substation control building.

4) Construction of a 10 kV metal-clad switchgear (KRPS-10 kV).

5) Installation of 12 cable lines from RP-10 kV to KRPS-10 kV at “Fursy” substation, 10 kV voltage, each circuit consisting of three single-core cables.

6) Installation of relay protection and automation systems for 110 kV equipment.

7) Installation of fire protection systems and external site lighting.

Reconstruction of the 110 kV outdoor switchgear at 110/35/10 kV substation “Ros” including installation of two additional bays.

The 110 kV switchgear is to be equipped with the following equipment:

  • 110 kV circuit breaker – gas-insulated, three-pole with complete drive system;
  • 110 kV gas-insulated current transformers;
  • 110 kV disconnectors – horizontal-rotary, three-pole with two grounding knives as line and bus disconnectors;
  • 110 kV surge arresters.

Client: PJSC “DTEK Kyiv Regional Electric Networks”