110/10 kV “Mototsikletna” Substation

This project involves the following work:

  • construction of a 110 kV substation;
  • re-routing of 110 kV cable sections from the “Nyvky-1 and -2” substations to the busbars of the “Mototsikletna” substation;
  • dismantling of existing equipment;
  • dismantling of reinforced concrete structures of the substation building;
  • construction of a four-story enclosed 110/10 kV substation with a cable basement;
  • installation of heating, ventilation, and air conditioning systems;
  • installation of water supply and sewer systems, and fire protection systems;
  • installation of main and auxiliary equipment for the 110/10 kV substation.

The following are subject to replacement:

  • motor-operated disconnectors – 6 sets;
  • isolators – 2 sets;
  • 110 kV surge arresters – 6 sets;
  • grounding switches with drives and surge arresters – 2 sets in power transformer circuits;
  • power transformer T1 TRDCN-63000/110-U1 115+9×1.78%/10.5-10.5 kV.