Back to projects

Connection to the power grid for the residential and office complex

The project provides for the following:
1. Power the 10/0.4 kV substation using four 10 kV cable lines:

  • from the 10 kV switchgear of substation TP1966 and from the 10 kV switchgear of substation TP2056, with a total route length of 1,150 m.
  • from the 10 kV switchgear of substation 876 and from the 10 kV switchgear of substation 4334, with a total route length of 1,400 m.

2. Laying of a 10 kV cable from RP210 to TP4334, using APvEgapu-15 3(1×120(g)/50) cable, with a length of 200 m.
3. Laying a 10 kV cable from TP2009 to TP2056, using APvEgapu-15 3(1×120(g)/50) cable with a length of 195 m.
4. Installation of two 1000 kVA power transformers in the 10/0.4 kV substation.
5. Installation of equipment in the 10 kV switchgear and in the 0.4 kV switchgear.