Cases
Implemented energy projects
750 kV Zaporizhzhia Substation
Reconstruction of the substation involving the replacement of the RODC-110000/750 kV shunt reactor (RSH-ZNPP Units A, B, C) at the 750 kV Zaporizhzhia Substation
In more detail
110/35/10 kV “Ros” Substation, 110/10 kV “Fursi” Substation
Construction of the 110/10 kV “Fursi” Substation and renovation of the 110/35/10 kV “Ros” Substation to connect the solar power plant of Fursi Energy Group LLC
In more detail
110 kV power line: Ros Substation – Fursi Substation
Construction of 110 kV power lines
In more detail
110/10 kV “Mototsikletna” Substation
Renovation of the 110/10 kV “Mototsikletna” substation located at 6A Dorogozhytska Street in Kyiv
In more detail
110/10 kV Gostomel Substation
Renovation of the 110/10 kV “Gostomel” Substation
In more detail
Renovation of seven units and the integration of a 300-MW unit at CHPP-6 into the energy market.
Reconstruction of 7 bays of the first and second busbar systems of the 110-kV switchgear at CHPP-6 of the “KYIV CHPPs” Joint Venture
In more detail
PS 110/35/10 kV “Bilychi”
Reconstruction of the 110/35/10 kV “Bilychi” substation regarding the power supply circuit for the 110/10/10 kV T-3 transformer, located at 64 General Naumov Street, Kyiv
In more detail
Troyeshchyna Substation
Renovation of the Troyeshchyna Substation, including the replacement of the 110-kV circuit breakers with SF₆ circuit breakers in Kyiv
In more detail