Back to projects

A site in southern Ukraine

List of Completed Works at the Facility

Below is the official list of construction, installation, and engineering works carried out as part of the project implementation:

  • Demolition of existing покрытия (surfaces/structures)
  • Site grading and leveling
  • Restoration of surfaces
  • Construction of foundations for installation of three gas piston units type XGC1900, 6.3 kV switchgear (RP-6.3 kV), three transformer substations (KTP-0.4/6.3 kV), supporting structures, and inspection platforms
  • Installation of three gas piston units type XGC1900, RP-6.3 kV, three KTP-0.4/6.3 kV
  • Construction of a network distribution station
  • Installation of hot water heating network pipelines (Ø 159–273 mm) and supporting structures
  • Installation of protection for critical elements of the facility
  • Construction of an automated commercial electricity metering system (ASKOE)
  • Laying of a gas pipeline to three gas piston units type XGC1900 with a capacity of 1900 kW each
  • Construction of an above-ground medium-pressure steel gas pipeline (Ø 89–400 mm) and supporting structures
  • Installation of a commercial gas metering unit
  • Implementation of an integrated automated control system
  • Construction of an automatic fire protection system
  • Retrofit of cell No. 7 of 6.3 kV switchgear (GRU-6.3 kV)
  • Installation of relay protection with installation of automation and protection cabinet
  • Construction of 0.4 kV cable line from the gas unit (KGU) to KTP-0.4/6.3 kV
  • Construction of 6.3 kV cable line from KTP-0.4/6.3 kV to RP-6.3 kV
  • Construction of 6.3 kV cable line from RP-6.3 kV to GRU-6.3 kV
  • Construction of 0.4 kV cable line from the boiler house switchgear to the network distribution station
  • Construction of telemechanics and communication systems
  • Installation of lightning protection and grounding system
  • Commissioning and start-up works of installed equipment and systems