Construction of a 110 kV cable line from the 110/35/10 kV “Ros” substation to the planned 110/10 kV “Fursy” substation:
- Installation of a double-circuit 110 kV cable line consisting of 3 single-core cables per circuit;
- cables – insulated with cross-linked polyethylene of the APvEgaPu-110 grade with a cross-section of 240 mm² and a copper shield with a cross-section of 95 mm²;
- Installation of a single-mode fiber-optic cable with 24 fibers to enable telemechanics and process communication.
The total length of the 110 kV power line route is 6,580 m, of which 2,400 m were laid using the trenchless method with the customer’s own HDD equipment.
Customer: PJSC “DTEK Kyiv Regional Power Grids”