1. Reconstruction of the 10 kV power line from the Irpin Substation to the 10 kV Distribution Point No. 107 1/2 in Bucha, Kyiv Oblast:
- 22 horizontal directional drilling (HDD) penetrations were completed, with a total length of 737 m.
2. Reconstruction of the 10 kV power line RPS-RP No. 6-2A in Fastiv, Kyiv Oblast:
- Four HDD boreholes were completed with a total length of 195 m.
3. Reconstruction of the 10 kV power line PST IRPIN – RP -10 kV No. 1/1 – No. 1/2 in Irpin, Kyiv Oblast:
- 6 horizontal directional drilling (HDD) penetrations were completed with a total length of 170 m.
4. Reconstruction of a 10 kV power line for connection to the electrical networks of residential buildings with integrated premises of a short-term childcare facility and the construction of an underground parking garage in the city of Bucha, Kyiv Oblast:
- Three HDD boreholes with a total length of 146 m were completed.
Client: PJSC “DTEK Kyiv Regional Power Grids”