Back to projects

Case in Poltava Region

 

A project to install an ENERGRID energy storage system with a capacity of 261 kWh has been implemented.

A full range of turnkey works was completed:

  • Installation
  • Connection
  • Configuration
  • System commissioning

The system provides the enterprise with backup power, energy consumption optimization, and greater energy independence.

The exact location and customer information are not disclosed for security reasons.