Construction and installation work on the electrical power supply for the “Multifunctional Complex with Retail and Office Space” project has been completed.

⠀⠀1. Installation of 10 kV APvEgaPu-15-3 cable (1x120g/50) sq. mm. From Section I of the 10 kV switchgear at TP6105 to Section I of the 10 kV switchgear at TP6854. Disconnection of the existing 10 kV cable “6105-6854” in the 10 kV switchgear at TP 6105 and TP 6854.

2. Power supply to the 10 kV switchgear sections of TP-10/0.4: 10 kV cable, model APEGAPu-15-3 (1x120g/50) sq. mm. (In the ground and in cable-pipe ducts):
– Section I – from Section I of the 10 kV switchgear at TP431 (compartment No. 15) and from Section I of the 10 kV switchgear at TP 6854. Disconnection of the existing 10 kV power cable “RP431 – 6854” at the 10 kV switchgear of TP431 and TP6854.
– Section II – from Section II of the 10 kV switchgear of TP573 and from the 10 kV switchgear of TP3975. Disconnection of the existing 10 kV cable line “573 – 3975” at the 10 kV switchgear of TP573 and TP3975.

⠀⠀3. Construction of a cable-pipe duct system for laying the 10 kV cable line. Equipping the 10 kV switchgear at TP8303 with Xiria (EATON) sections, a special-purpose cabinet ShVP-2 with an automatic transfer switch (ATS) unit, and a Mercury 230 ART-01 PQRSIV, 5 (60) A electricity meter.

⠀⠀4. Connection of the internal grounding circuit of the 10 kV switchgear to the grounding circuit of TP8303.
Installation of a security alarm system in the 10 kV switchgear of TP8303 based on the “Danube 8/32” control panel.