Cases
Renovation
Troyeshchyna Substation
Renovation of the Troyeshchyna Substation, including the replacement of the 110-kV circuit breakers with SF₆ circuit breakers in Kyiv
In more detail
Protasivska Substation
Reconstruction of the Protasivska Substation, including the replacement of 110-kV circuit breakers and switchgear with SF₆ circuit breakers in Kyiv
In more detail
PS “Lepse” – RP-64
Renovation of the 10 kV power supply networks for Substation 67
In more detail
PS “University” – RP-201, PS “Teremkivska” – RP-67
Reconstruction of the 10 kV power supply networks for the “University” substation – RP-201 and the “Teremkivska” substation – RP-67
In more detail
Connection of a 6.8 MW photovoltaic power plant to the power grid
Connection of a 6.8 MW photovoltaic power plant to the power grid, Vyshhorod Solar Power Plant LLC
In more detail
110/6 kV Substation “GPP”
Reconstruction of the 110/6 kV “GPP” Substation in the village of Trypillya, Obukhiv District, Kyiv Region
In more detail
TP-888
Renovation of TP-888 in the Holosiivskyi District of Kyiv
In more detail
Connection to the office center’s electrical grid
Electrical connections for the office center located at: 68 Zhylianska St., Kyiv
In more detail