Cases
Construction
A site in southern Ukraine
Construction of a cogeneration complex in southern Ukraine based on gas piston units with a total capacity of 5.7 MW for the simultaneous production of electricity and heat.
In more detail
330 kV “Podilskaya” Substation
In more detail
330 kV Kamianets-Podilskyi Substation
Reconstruction of the 330 kV “Kamianets-Podilskyi” substation, including the replacement of the
330 kV and 110 kV bays, taking into account the need to carry out the work while the facility remains in operation.
In more detail
750 kV Zaporizhzhia Substation
Reconstruction of the substation involving the replacement of the RODC-110000/750 kV shunt reactor (RSH-ZNPP Units A, B, C) at the 750 kV Zaporizhzhia Substation
In more detail
110/35/10 kV “Ros” Substation, 110/10 kV “Fursi” Substation
Construction of the 110/10 kV “Fursi” Substation and renovation of the 110/35/10 kV “Ros” Substation to connect the solar power plant of Fursi Energy Group LLC
In more detail
110 kV power line: Ros Substation – Fursi Substation
Construction of 110 kV power lines
In more detail
110/10 kV “Mototsikletna” Substation
Renovation of the 110/10 kV “Mototsikletna” substation located at 6A Dorogozhytska Street in Kyiv
In more detail
Livoberezhna Station
Renovation of the power supply networks for Substation RP-216 at 21A Raiduzhna Street in Kyiv
In more detail
- 1
- 2